Pipe bridge, STEP Oy

Pipe bridge, STEP Oy

STEP Oy is building a pipe bridge that runs from Harjavalta Industrial Park to the Harjavalta Battery Materials Factory (BASF Battery Materials Finland Oy). The magnificent pipe bridge contains about 1,000,000 kg of steel structures and 10 km of chemical pipelines. The largest blocks of the bridge are 46 m long and weigh almost 100 t. We supply the entire pipeline bridge piping and pipe insulation for this project. Demanding pipelines are prefabricated at our Raisio pipe prefabrication plant and equipped into blocks before being exported to the construction site. The project will be completed in autumn 2021.