We carried out pipe and equipment installations at the Vatajankosken Sähkö gas engine plant: high and low-pressure steam piping and condensate and feed water piping, back boiler and installation of pumps, heat exchangers, and a fan.

Power plant, Naantali
Renewal of the steam piping turbines at the Fortum Power & Heat power plant, ordered by Skoda Doosan Power. We removed the old piping, manufactured new ones and installed them.