We prepared a pipe bridge for the expansion of Gasum’s biogas plant to Topinoja in Turku in 2019. The length of the pipeline bridge is about 250 meters and it consists of 34 meter blocks. The blocks were equipped, Electrical resistance trace heated and pre-insulated for installation at the Ardor piping factory.
Biogas plant, Riihimäki, Gasum Oy
We built Gasum Oy’s Riihimäki biogas plant. The project included a pipeline and machinery contract as well as a pipe bridge