We prepared a pipe bridge for the expansion of Gasum’s biogas plant to Topinoja in Turku in 2019. The length of the pipeline bridge is about 250 meters and it consists of 34 meter blocks. The blocks were equipped, Electrical resistance trace heated and pre-insulated for installation at the Ardor piping factory.
Biogas plant expansion, Gasum Oy, Turku
Industrial projects
Heat recovery plant, Vatajakoskensähkö Oy
Wastewater treatment plant, YIT Oy
Pipe bridge, STEP Oy
Pipe bridge, Raisio Oyj
Pipe bridge, Vaasa
Production lines, Honkajoki Oy
Biogas plant, Watrec Oy
Biogas plant hygiene revision, Gasum Oy, Turku, BTA International GmBh
Biogas plant, Gasum Turku, BTA international Gmbh
Biogas plant expansion, Gasum Oy, Turku
Biogas plant expansion, Gasum Oy, Riihimäki
Biogasplant renewals, Gasum Oy
Conveyor changes, Honkajoki Oy
Expansion of the Oulu biogas plant, Watrec Oy
Biogas plant, Riihimäki, Gasum Oy
Biogas plant, Biotehdas Ltd, Oulu
Bioenergy heating plant, Turku
Power plant, Naantali
Oulu Biogas plant, Gasum Oy
Biogas plant, Honkajoki
Wastewater treatment plant, Honkajoki
Gas engine plant, Honkajoki