We delivered a pipe bridge with a length of about 100 meters to the factory in Vaasa. The 12-meter-long blocks were equipped and pre-insulated at the Ardor pipe prefabrication factory. The name of the client of the project implemented in 2020 has not been published.
Biogas plant expansion, Gasum Oy, Turku
We prepared a pipe bridge for the expansion of Gasum’s biogas plant to Topinoja in Turku in 2019. The length of the pipeline bridge is about 250 meters and it