Renewal of the steam piping turbines at the Fortum Power & Heat power plant, ordered by Skoda Doosan Power. We removed the old piping, manufactured new ones and installed them. We finalised the project with thermal treatment and CE marking for the pipes.
Gas engine plant, Honkajoki
We carried out pipe and equipment installations at the Vatajankosken Sähkö gas engine plant: high and low-pressure steam piping and condensate and feed water piping, back boiler and installation of