Piping and equipment installations as well as covering the wastewater tank at the wastewater treatment plant. The order came from Honkajoki Ltd. and the equipment was delivered by the Dutch company: AQUA Industrial Watertreatment.

Bioenergy heating plant, Turku
Piping and combustion gas flue installations, PED documentation and NDT check on the pipes. The order was from Renewa Ltd. and the end customer was Turku Energy: completed in 2015.