Shipbuilding

Carnival Mardi Gras

We will deliver roughly 400 tonnes of prefabricated pipes to the Carnival Cruise Lines cruise ship Mardi Gras in 2019 – 2020 when the superstructure will be built at the Meyer Turku shipyard. Approximately four fifths of the delivery will go to the turnkey contractors at the shipyard, the rest will go directly to the …

Costa Smeralda

We will deliver roughly 400 tonnes of prefabricated pipes to the Costa Cruise LInes new ship. The vast majority of the delivery will be used in the areas being built by the turnkey contractors at the Meyer Turku shipyard. Costa’s new cruise ship is due to be ready in 2019.

Mein Schiff 2

We delivered to this vessel roughly 400 tonnes of prefabricated pipes of which almost half were installed by Meyer Turku themselves. Mein Schiff 2 made her maiden voyage from Turku at the beginning of 2019 and is owned by TUI Cruises.

Mein Schiff 1

The second newest vessel from the repeat order from TUI Cruises shipping company to be built at the Meyer Turku shipyard in 2018. Sihy delivered about 390 tonnes.

Tallink Megastar

About 130 tonnes of prefabricated pipes to the new Tallink LNG car ferry. Unusually, this project, completed in 2017, had only customer: the Meyer Turku shipyard that built the vessel.

Mein Schiff 6

We delivered about 230 tonnes of prefabricated pipes. The shipyard ordered roughly half, but Europlan’s orders came to about the same. The project was completed in 2017 and the ship was built, as usual, at the Meyer Turku shipyard.

Mein Schiff 5

We produced about 300 tonnes of prefabricated pipes for the third vessel in the Mein Schiff cruise ship series. The majority of the deliveries were used by the Turku shipyard, but the orders from turnkey contractors were also significant. The project was completed in 2016.