Heat recovery plant, Vatajakoskensähkö Oy
We supplied more than 50,000 kg of 1400mm diameter stainless steel heat recovery ducts between the Kankaanpää Knauf plant and

We supplied more than 50,000 kg of 1400mm diameter stainless steel heat recovery ducts between the Kankaanpää Knauf plant and

Helsingin seudun ympäristöpalvelut HSY is building a new wastewater treatment plant in the Blominmäki bedrock in Espoo. The underground cavern will

We delivered 10 km of chemical pipelines and 1,000,000 kg of steel structures to the Harjavalta Battery Materials Factory. The

We delivered a pipe bridge with a length of approximately 650 meters to Raisio plc’s new plant. The bridge blocks

We delivered a pipe bridge with a length of about 100 meters to the factory in Vaasa. The 12-meter-long blocks

We built three new production lines for Honkajoki Oy. We carried out their piping and equipment installations and steel structures,

All installation work for industrial piping and machines equipment’s at Mäntsälä biogas plant.