We delivered a pipe bridge with a length of approximately 650 meters to Raisio plc’s new plant. The bridge blocks (á 20–23 m) were equipped and pre-insulated at the Ardor workshop. Delivery to the customer in 2020.
Biogas plant expansion, Gasum Oy, Turku
We prepared a pipe bridge for the expansion of Gasum’s biogas plant to Topinoja in Turku in 2019. The length of the pipeline bridge is about 250 meters and it