Pipe bridge, Raisio Oyj

Pipe bridge

We delivered a pipe bridge with a length of approximately 650 meters to Raisio plc’s new plant. The bridge blocks (á 20–23 m) were equipped and pre-insulated at the Ardor workshop. Delivery to the customer in 2020.

Pipe Bridge

Pipe bridge, STEP Oy

We delivered 10 km of chemical pipelines and 1,000,000 kg of steel structures to the Harjavalta Battery Materials Factory. The largest blocks of the pipeline bridge were 46 m long

Lue lisää »
Pipe bridge

Pipe bridge, Vaasa

We delivered a pipe bridge with a length of about 100 meters to the factory in Vaasa. The 12-meter-long blocks were equipped and pre-insulated at the Ardor pipe prefabrication factory.

Lue lisää »