All installation work for industrial piping and machines equipment’s at Mäntsälä biogas plant.
All installation work for industrial piping and machines equipment’s at Mäntsälä biogas plant.
Piping and combustion gas flue installations, PED documentation and NDT check on the pipes. The order was from Renewa Ltd. and the end customer was Turku Energy: completed in 2015.
Gasum Oy Riihimäki biogas plant sludge heat exchange capacity increase; Gasum Oy / Watrec Oy; Riihimäki
Hygiene revision of Gasum Oy Turku Biogas Plant. Contract included piping and equipment installations and insulations. Main contractor of the project were BTA International GmBh
We carried out all the piping and equipment installations: process equipment, piping, gas storeroom, slurry bags, piping bridges and service platform steel structures. We were also responsible for the production
Gasum Oy Turku new biogas plant. Contract included Piping and equipment installations, pipe bridge, maintenance levels and stair towers.
Piping and equipment installations at the Honkajoen biogas plant: process equipment installation and piping production and installation, production and installation of the steel structures for the piping bridges, and gas
We built Gasum Oy’s Riihimäki biogas plant. The project included a pipeline and machinery contract as well as a pipe bridge
We renovated the biogas plants for Gasum Oy at Oulu, Kuopio, Honkajoki and Riihimäki. The renovations included piping and equipment installations.
We expanded Gasum’s Oulu biogas plant, where Watrec Oy acted as the main contractor. Our own delivery included piping, machinery, pipe bridge and maintenance levels.
We supplied more than 50,000 kg of 1400mm diameter stainless steel heat recovery ducts between the Kankaanpää Knauf plant and the new heat recovery plant. The Knauf plant produces drywalls,
We built Gasum Oy’s Oulu biogas plant. Our project included a pipeline and machinery contract as well as a pipe bridge.
Piping and equipment installations as well as covering the wastewater tank at the wastewater treatment plant. The order came from Honkajoki Ltd. and the equipment was delivered by the Dutch
Helsingin seudun ympäristöpalvelut HSY is building a new wastewater treatment plant in the Blominmäki bedrock in Espoo. The underground cavern will be used for sewage treatment tanks and most of the