Oulu Biogas plant, Gasum Oy

We built Gasum Oy’s Oulu biogas plant. Our project included a pipeline and machinery contract as well as a pipe bridge.

Biogas plant, Biotehdas Ltd, Oulu

We carried out all the piping and equipment installations: process equipment, piping, gas storeroom, slurry bags, piping bridges and service platform steel structures. We were also responsible for the production

Lue lisää »

Biogas plant, Honkajoki

Piping and equipment installations at the Honkajoen biogas plant: process equipment installation and piping production and installation, production and installation of the steel structures for the piping bridges, and gas

Lue lisää »
Pipe bridge

Pipe bridge, Raisio Oyj

We delivered a pipe bridge with a length of approximately 650 meters to Raisio plc’s new plant. The bridge blocks (á 20–23 m) were equipped and pre-insulated at the Ardor

Lue lisää »
Pipe Bridge

Pipe bridge, STEP Oy

We delivered 10 km of chemical pipelines and 1,000,000 kg of steel structures to the Harjavalta Battery Materials Factory. The largest blocks of the pipeline bridge were 46 m long

Lue lisää »
Pipe bridge

Pipe bridge, Vaasa

We delivered a pipe bridge with a length of about 100 meters to the factory in Vaasa. The 12-meter-long blocks were equipped and pre-insulated at the Ardor pipe prefabrication factory.

Lue lisää »