We delivered 10 km of chemical pipelines and 1,000,000 kg of steel structures to the Harjavalta Battery Materials Factory. The

We delivered 10 km of chemical pipelines and 1,000,000 kg of steel structures to the Harjavalta Battery Materials Factory. The

We delivered a pipe bridge with a length of approximately 650 meters to Raisio plc’s new plant. The bridge blocks

We delivered a pipe bridge with a length of about 100 meters to the factory in Vaasa. The 12-meter-long blocks

We prepared a pipe bridge for the expansion of Gasum’s biogas plant to Topinoja in Turku in 2019. The length

We built Gasum Oy’s Riihimäki biogas plant. The project included a pipeline and machinery contract as well as a pipe

We built Gasum Oy’s Oulu biogas plant. Our project included a pipeline and machinery contract as well as a pipe