Pipe bridge, Raisio Oyj We delivered a pipe bridge with a length of approximately 650 meters to Raisio plc’s new plant. The bridge blocks (á 20–23 m) were equipped and pre-insulated at the Ardor workshop. Delivery to the customer in 2020. Read more
Conveyor changes, Honkajoki Oy We made the conveyor changes in the by-product department of HKScan Oy Rauma’s poultry plant in 2018. Read more